Auditing of a waste-incineration plant in Netherlands

Auditing of a waste-incineration plant in Netherlands. The waste flow rate is 26.5 t/h. The furnace chamber contains 3 lanes. 9 elements, including the roof units are water-cooled and a further 6 elements are air-cooled. We assigned a team of 50 employees for this project. This included mechanics, fitters, foremen, construction site management, engineers, locksmiths and welders (WIG/TIG, MIG/MAG and electrodes). Including welders approved for high pressure containers.

The following plant components were revised or replaced in the firing technology in order to ensure fault-free operation for a further 2 years.

Combustion grate, grate drive, dosing pestle, 3-way water valve, water system for water-cooled combustion grate. Conversion of water-cooled roof units to air-cooled roof units.